Ali Moaveni

Abschluss: Dipl.Ing, Montan University

Leoben, Österreich

Fähigkeiten und Kenntnisse

Computer
supervising
engineering
mineral processing
labratories

Werdegang

Berufserfahrung von Ali Moaveni

  • Bis heute 10 Jahre und 1 Monat, seit Juni 2014

    Research Assistant

    Montanuniversität Leoben
  • 10 Monate, Jan. 2013 - Okt. 2013

    Shift Production Supervisor

    Tabas Parvade Coal Cleaning Plant

    Tabas Coal Mine, one of the biggest coal deposits in the Middle East, is located in South Khorasan province; Iran. My main responsibilities were, all possible checking, controlling and creating probable changes in plant circuit keeping in mind the production goals of both quantity and quality. Controlling, problem solving and adjusting the process in order to achieve the best quality and quantity production level while minimizing coal loss in tailing line was as the major target while carrying out my duty.

  • 1 Jahr und 2 Monate, Nov. 2011 - Dez. 2012

    Technical Engineer and Project Manager

    Fadjr Mazinoo Coal Mine

    Fadjr Mazinoo Coal Mine is a private owned company in Iran and contains anthracite coal. Besides the overall daily activity planning, I was responsible for the mining path of the pit activities; the positioning of the mining equipments, coal specification check, reporting the amount of coal and waste extraction and used explosive material on a monthly basis to Iranian Mining Engineering Organization. As project manager I was responsible for controlling the drilling & blasting contractors` procurement.

  • 1 Jahr und 3 Monate, Aug. 2008 - Okt. 2009

    Researcher

    Miduk Copper Complex

    Miduk Copper Complex is an open pit mine with 0.2% copper cut of grade which includes an 800 t/h capacity enrichment plant. My M.Sc. thesis was a research at Miduk`s Copper Concentrator on SAGMill performance optimization to achieve lowest fine particles in SAGMill`s production and power draw. I did a separate experimental design on four variable parameters to simulate each parameter effect on its treatment. I also calculated some grinding parameters such as (SPI, BBMI, etc).

  • 9 Monate, Apr. 2007 - Dez. 2007

    Researcher

    Advance Mineral Processing Research Center of Karaj, Iran

    I did a free research on Dust’s Elemental Sulphur enrichment of Sarcheshmeh Copper Mine which is produced from stack’s melting factory via Flotation Method. I also researched on dust’s milling and elemental sulphur separation which is used at sulphuric acid plants. Furthermore, I tried to predict dust’s milling behaviour and mill’s power draw.

Ausbildung von Ali Moaveni

  • 2 Jahre und 3 Monate, Sep. 2013 - Nov. 2015

    Mineral Processing

    Montan University

  • 3 Jahre und 9 Monate, Jan. 2007 - Sep. 2010

    Mineral Processing Engineering

    Science and Research University of Tehran

    Mineral Processing, Beneficiation, Separation, Raw Material Enrichment

  • 4 Jahre und 10 Monate, Sep. 2001 - Juni 2006

    Mining Engineering (Exploitation)

    University of Yazd

    B.Sc. Degree in Mining Engineering- Exploitation Thesis: Investigation on Photovoltaic cells usage for mines supply

Sprachen

  • Englisch

    Fließend

  • Deutsch

    Gut

Interessen

Spending time with my friends
traveling
reading books
Skiing
karate
play tennis

21 Mio. XING Mitglieder, von A bis Z