Anatolii Salimzibarov

Angestellt, Head of C&I project`s group, Samara Oil&gas project institute

Orenburg, Russische Föderation

Werdegang

Berufserfahrung von Anatolii Salimzibarov

  • Bis heute 10 Jahre und 5 Monate, seit Feb. 2014

    Head of C&I project`s group

    Samara Oil&gas project institute

    1. Composition & agreement of technical terms for engineering of automatization, Communications Data System, SCADA, TeleMechanics, Power Supply, Fire/Gas safety system, DCS, CCTV, BMS etc. 2. Distribution of works inside the group. 3. Control of correctness & quality for technical documentation. 4. Project presentation to the customer. 5. Designer supervision. 6. Development, design control systems 7. Precommissioning and commissioning 8. Author supervision

  • 1 Jahr und 9 Monate, Feb. 2012 - Okt. 2013

    Head of C&I department

    Global Petro Chemical Processes Inc. (Canada), Orenburg Branch

    Engeneering, exploration, commissioning works for “Gazprom-Dobycha Orenburg” – reconstruction of the wastewater treatment plant. Concept, Front End Engineering Development, Technical Study & Detailed Design, Author supervision

  • 11 Monate, Apr. 2011 - Feb. 2012

    Head of Complex Engineering Department

    OilGasAutomatics

    Concept, Front End Engineering Development, Technical Study & Detailed Design - 1. Composition & agreement of technical terms for engineering of Technologics Automatization, Communications Data System, SCADA, TeleMechanics, Power Supply, Fire/Gas safety system. 2. Distribution of works inside the group. 3. Control of correctness & quality for technical documentation. 4. Project presentation to the customer. 5. Author supervision.

  • 7 Monate, Okt. 2010 - Apr. 2011

    Head of Complex Engineering Department

    NIPI Avangard Ural

    1. Engineering-geodethic, engineering-geologic & engineering-ecological explorations for >100 objects at Orenburg Region territory (the construction of digital broadcasting towers) . Common handling for exploration works. 2. The control of correctness & quality for technical documentation. 3. The project presentation to the customer.

  • 8 Jahre und 3 Monate, Aug. 2002 - Okt. 2010

    Head of the C&I group.

    “OrenburgNIPIneft” (Orenburg Oil&gas project institute)

    Concept, Front End Engineering Development, Technical Study & Detailed Design Working up the technical tasks for projection of parts in industrial control, automation of technology, telemechanics, connection and signaling. Inspection of quality and accuracy of executing of working documents. Presentation of the project to the customer. Solution of the questions connected with the unit-building. Presentation of the project in expert organizations. Author supervision.

  • 2 Jahre und 4 Monate, Mai 2000 - Aug. 2002

    C&I Design Engineer

    OrenburgGasAutomatics

    Working up the technical tasks for projection of parts in industrial control, automation of technology, telemechanics, connection and signaling

21 Mio. XING Mitglieder, von A bis Z