Eduardo Luyun

Angestellt, Sr. Project Manager, Kulltelecom

Riyadh, Saudi-Arabien

Fähigkeiten und Kenntnisse

Work experience in Service Delivery organizations
medium to large scale roll out projects .Strong P
adaptable
comfortable with change and experience in leading

Werdegang

Berufserfahrung von Eduardo Luyun

  • Bis heute 16 Jahre, seit Juli 2008

    Sr. Project Manager

    Kulltelecom

    • Project Management of the scope of work awarded to the company small or medium project. • Budget analysis and forecast the required resources to execute the job. • Works with subordinates and immediate own manager. • Translates business issues into plans that will lead to actions which will ensure results. • Responsible for managing resources like people, budget, timelines etc. • Responsible for delivering the units results according to agreed plan. • Meets Kullcom business objectives, in terms of revenu

  • 1 Jahr und 2 Monate, März 2007 - Apr. 2008

    Transmission Manager

    LM Ericsson Intl; Saudi Arabia

    • Implementation of Transmission Network on GSM 3G on rollout project time frame • Doing analysis on new system on network regarding design problem • Coordination of how to implement new generation of ML TN on new software version upgrading and downgrading to adjust the existing ML on site • Assigning work orders on subcontractor based from their capabilities on their team performance • Know perform commissioning and integrate of Minilink TN, HC and Network Management System (DCN Plan) • Good understand

  • 1 Jahr und 6 Monate, Juli 2006 - Dez. 2007

    Transmission Network Designer

    LM Ericsson Intl; Iran Branch

    • Experienced in network planning in long distance network, junction network for digital microwave, intercity microwave for GSM network. • Prepare C modules Radio site installation document for TRM IE • Site survey planning for network integration for IBS and Macro sites Micro sites to existing sites • Doing system design for radio network for high and low capacity like HC, TN and ML E radio, such as 20p,6p,2p and MPH flexible solution and STM1 network including assigning IP and ID address for MSM • Doin

  • 5 Jahre und 5 Monate, Feb. 2001 - Juni 2006

    Transmission Manager

    Itea International Saudi Arabia

    • Manage Civil and Electrical site implementation team with Ericssson, Alcatel and Motorola Project with STC and Mobily service provider. MODA project Using Marconi Equipment • Lead RF radio frequency Planning tools like path profile tools requirement and frequency interferences tools. Like Nera and Bosch and K&K tools Path loss • Manages and train team in long and short haul radios like NERA ,Alcatlel Telletra ,Ericsson, Siemens and ANT and Bosch Telecom equipment and Marconi MDRS 155EC Moda Project ;Har

  • 2 Jahre und 1 Monat, Jan. 1999 - Jan. 2001

    Sr System Engineer

    Lucent Technology Saudi Arabia

    • System Design on Junction and Long Distance SDH network. • Planning QLAN, EOW and Synchronization. • Digital microwave network system engineering design. • Preparing detailed design document using database input for engineering • Equipment involved such ISM1, ISM4/1,ADM4/1,ADM16, SLR16, OLS 80 G, DAC4/4/1 and NERA MW radios, AnyMedia, Router for QLAN, HDSL system design. • Experienced Commissioning Engineer of the equipment mentioned as per ITU-T recommendation in Test Protocol. • Develop software tools/

  • 3 Jahre und 10 Monate, Apr. 1995 - Jan. 1999

    Transmission Manager

    LM Ericsson Intl ,Philippines

    • Managing people and delivering business results • Understand customer needs on quality and speed • Experience in managing internal/external Customers • Excellent influencing and negotiating skills with customer on technical problem • Good understanding of Test Environment operations on SDH Radio and Mux • Manage a team to implementation and commissioning of SDH Radio, SDH MUX support and deliver the site on time to the customer. • Strong Problem solving skills and team player. • Ability to manage confl

  • 2 Jahre und 6 Monate, Juli 1993 - Dez. 1995

    Commissioning Engineer SDH Specialist

    Siemens AG Saudi Arabia Branch

    • Responsible for commissioning on SDH Mux.STM1, STM4, SLT4, SLR4 latest generation of PCM30 software and window base system. • Planning SDH network synchronization and EOW. • Site survey of exchanges and transmission equipment relocation. • Cut over procedures of existing traffic migration to new digital exchange. • Testing and interfacing of other system with TMN. .

  • 3 Jahre und 11 Monate, Juni 1989 - Apr. 1993

    Sr Transmission Engineer Tester

    LM Ericsson International Saudi Arabia

    • Installation, testing and commissioning of PDH system PCM30 Mux , Line System140 and 565 Mb/s under MOPTT Telecommunication Expansion Project 4 (TEP4). • Involved in commissioning of 140 and565 Mb/s FOTS 6+1 Ring protection with repeaters configuration network long haul system for Ministry of Defense and Aviation in the whole Kingdom of Saudi Arabia approx.8800 Km of Fiber Optics existing. • Installation and test of video conferencing system, transmissions over fiber system using video test protocols. •

  • 6 Jahre und 1 Monat, Juni 1983 - Juni 1989

    Microwave Engineer and Line Engineer

    Sartelco,Sirti Grp of Co.

    • Installation and Commissioning of Mar6E 6 GHz, MS109E 4GHz and 6 GHz Telletra Analog Radio, MAS10 Multi Line Analog Switch for Long Distance and Junction Network • O & M for SAIK II on both Video and VF channel analog system. Perform standard test procedure according to ITUT and CCITT recommendation for acceptance test. • Installation and Commissioning of 12,18,60 MHz Coax Cable Philips and Ericsson system involving line repeaters on long haul system. • O & M of Long Distance Coaxial Cable System 12, 18,6

  • 3 Jahre, Juni 1980 - Mai 1983

    Asst,Transmission Engineer

    Philippines Telegraph and Telephone Co.

    • Installation and commissioning of uhf and microwave analog radio and multiplex. • Preparation of engineering plan, network diagram of microwave radio configuration, • Doing path calculation and propagation test on new links suspected for worst fading period. • Backbone rehabilitation rerouting and implementation of the project

Ausbildung von Eduardo Luyun

  • 4 Jahre und 10 Monate, Juni 1975 - März 1980

    Telecom

    Bachelor of Science in Electronics and Communication Engineering

    Digital Microwave and Instrumentation

  • 5 Jahre, Juni 1975 - Mai 1980

    Microwave and Digital Electonics

    FEATI University

    Telecommunication Microwave and GSM

Sprachen

  • Englisch

    -

Interessen

Interest on Telecom Consultancy
Professional Management and Service Delivery on Roll out project Experienced in Civil Telecom
Wireless and Fixed Network

21 Mio. XING Mitglieder, von A bis Z