Edward (Frank) Rimmer
Angestellt, Lead C&I Engineer, Black & Veatch Ltd
Rabigh, Saudi-Arabien
Werdegang
Berufserfahrung von Edward (Frank) Rimmer
Bis heute 13 Jahre, seit Juli 2011
Lead C&I Engineer
Black & Veatch Ltd
Owners Engineer 2x660 MW IPP, Rabigh, Saudi Arabia
8 Monate, Dez. 2010 - Juli 2011
Sr. Instrument & Control Engineer
Poyry Energy Ltd (Vietnam)
Vung Ang, Vietnam; Owners Engineer/Consultant for design review, construction and commissioning of Thermal Power Project (2 x 600 MW) coal fired.
1 Jahr und 2 Monate, Nov. 2009 - Dez. 2010
Sr. Instrument & Control Engineer
Parsons Brinckerhoff (PB Power)
Fujairah, United Arab Emirates (UAE). Owners Engineer/Consultant (FAPCO) for construction & commissioning of Fujairah F2 (IWPP) CCGT Power & Desalination Project. Transferred to Doha to complete RAF-A1 Desalination Project.
1 Jahr und 3 Monate, Sep. 2008 - Nov. 2009
Sr. Instrument & Control Engineer
Fichtner Consulting Engineers
Quang Ninh, Vietnam; Owners Engineer/Consultant for design review construction and commissioning of Quang Ninh Thermal Power Project (4 x 300 MW) coal fired.
1 Jahr und 1 Monat, Sep. 2007 - Sep. 2008
Sr. Instrument Engineer
Fluor
Ras Laffan, Qatar; RasGas Common Offplots Projects and a member of the Fluor Field Engineering Management Team
9 Monate, 2007 - Sep. 2007
Sr. Instrument & Control Engineer
MTMM / Mott MacDonald
Rabigh, Saudi Arabia; Assigned to the Aramco/Petro-Rabigh Desalination & Power Project (IWSPP) as the Owners Engineer/Consultant (RAWEC).
2006 - 2007
Instrument Construction Engineer
Sakhalin Energy (SEIC)
Sakhalin Island, Russia; Assigned to the Sakhalin II (OPF) Onshore Gas Processing Facility, as the PMC/Owners Engineer to oversee and manage EPC contractor during construction of major onshore gas processing facility
2005 - 2006
Lead Control Systems Engineer
Parsons Fluor Daniel (PFD)
Tengiz, Kazakhstan; Assigned to the SGI/SGP Project for Tengizchevroil as a member of the PFD (Managing Contractor PMC) engineering/turnover team overseeing construction and commissioning
1 Jahr und 2 Monate, Apr. 2004 - Mai 2005
Instrument Engineer
Fluor
Kuwait; Assigned to the Kuwait Oil Company (KOC) Major Projects Group as the PMC/Owners Engineer to oversee and manage upgrade of existing oil gathering centres (GOSPS)/booster stations and construction of two new build effluent water treatment/disposal plants.
2005 - 2005
Lead I/E Control Systems Engineer
Stone & Webster (Shaw Group)
Tehran & Bandar Imam, Iran; NPC/Arvand PVC Project as the PMC/Owners Engineer for Arvand Petrochemical Ltd PVC project.
2002 - 2004
Instrument & Electrical Engineer
ABB Lummus Global Nigeria
Oshie, Nigeria; Assigned to the AGIP Gas recovery and flow station upgrade and a member of the AGIP (NAOC) Project Management Consultancy team (PMC/Owners Engineer) to oversee and manage flow station revamp.
2001 - 2002
Sr. Instrument & Control Engineer
Lahmeyer Consulting Engineers
Colombo, Sri Lanka; Kellannitissa Power Project as the Owners Engineer/Consultant (Ceylon Electricity Board) during construction and commissioning of 165 MW Combined Cycle Power Plant.
2001 - 2001
Instrument Engineer
Foster Wheeler International
Thailand & Philippines; Shell Malampaya Onshore Gas Project initially from engineering office in Thailand and later followed by an assignment to the project site in the Philippines, responsible for leading the Commissioning Support Team.
2000 - 2001
Lead Instrument & Control Engineer
Merz McLellan (PB Power) & Saudi Consulting Services
Shoaiba, Saudi Arabia; Owners Engineer/Consultant (SCECO) to review design and oversee construction of oil fired power generation project, first phase of 3 x 390 MW STG and associated balance of plant.
10 Jahre und 4 Monate, März 1990 - Juni 2000
Lead Instrument & Control Engineer
Fluor
Corpus Christi, Texas and Minneapolis, Minnesota, USA. Assigned to the Koch-Fluor Engineering Alliance on-site Refinery project team with responsibility for engineering of ongoing rehabilitation / reliability, planned refinery shutdown maintenance works and small capital projects within both existing refinery complexes.
1 Jahr und 4 Monate, Dez. 1996 - März 1998
Instrument & Control Engineer
Dome'X Engineering Consultants
Providing I&C engineering consultancy services for the following construction projects: • Urea shiploading facility, Sitra Island – Bahrain (Gulf Petrochem Ind/AMECO S.A. Co) • Refinery project (Leuna 2000) Leuna, Sachsen – Germany (Elf Petroleum/Mider) • 4 x 550 MW STG Power project, Taichung – Taiwan ROC (Taipower/Black & Veatch) • Forcados Terminal upgrade, St Quentin-on-Yvelines, Paris – France (Shell/Bouygues Offshore)
11 Monate, Sep. 1995 - Juli 1996
Control & Instrument Engineer
GEC Alstom
GEC Alstom (Powergen), Deeside, Wales, UK . Employed by the Managing contractor GEC Alstom to oversee construction phase of 1400 MW CCGT Power Plant Project.
1996 - 1996
Instrument Engineer
Amoco Netherlands
AMOCO Netherlands B.V. Alkmaar, Netherlands. Onshore gas project, overseeing commissioning of burner management system, gas heaters and associated equipment.
2 Jahre und 1 Monat, Sep. 1993 - Sep. 1995
Instrument Engineer
Chiyoda Corporation
Nigerian National Petroleum Corp, Warri Refinery, Nigeria. Project management for Chiyoda Corp. overseeing / supervising refinery revamp project followed by O&M term with NNPC.
1 Jahr und 2 Monate, Aug. 1992 - Sep. 1993
Instrument & Control Engineer
Mitsui & Toshiba JV
Anpara B, Sonebhadra, Uttar Pradash, India. Project management team overseeing sub-contractors during installation and commissioning of BOP at the Anpara ‘B’ 2x500 MW STG (coal fired) Thermal Power Project.
Ausbildung von Edward (Frank) Rimmer
8 Jahre und 10 Monate, Sep. 1975 - Juni 1984
Instrumentation and Control Engineering
Halton, Cheshire
Industrial Measurement and Control
Sprachen
Englisch
-