Iulian Badescu

Angestellt, Field Engineer, CAMERON ALGERIA

Ploiesti, Rumänien

Werdegang

Berufserfahrung von Iulian Badescu

  • Bis heute 14 Jahre und 6 Monate, seit 2010

    Field Engineer

    CAMERON ALGERIA

    • Installation and maintenance in field of compact SSMC & conventional surface wellheads, gate valves and chokes in Algeria for customers like JV Gas – JV between Statoil, BP and Sonatrach.(Cameron Hassi Messaoud, Algeria ) • I worked in all stages for SSMC also in completion wells with SSMC tubing hanger. • Organizing, managing and servicing wellhead and X mas tree related operations in 4 drilling rigs. • Disassembling, repairing and testing in workshop and installing at XmasTree valves FL, FLS, FLSR, W

  • 8 Monate, Jan. 2010 - Aug. 2010

    Field Engineer -Wellhead

    Cameron – Romanian

    • Disassembling and repairing in workshop and installing at XmasTree valves FL, FLS, FLSR, WKM type . • Maintenance of XmasTrees

  • 2 Jahre und 10 Monate, Apr. 2007 - Jan. 2010

    Field Engineer Artificial Lift

    Cameron – Romanian

    • Supervising activity of equipping wells with bottom equipment (RHAC, THC, PCP pumps, BAKER type tubing anchor catcher). • Supervising activity of well intervention (pumping well) in most Romanian Petroleum Fields at low and high depth wells. • Supervising activity of reinforcing and disarming, maintenance of BAKER type tubing anchor catcher. • Proposals for well flow optimization • Direct involvement in maintenance, troubleshooting, repair, assembly and testing activities at customer’s. • Location or in

  • 1 Jahr und 7 Monate, Okt. 2005 - Apr. 2007

    Production Foreman.

    PETROMAR - Romanian Drilling and Production Company – offshore.

    • I established and analyzed requisitions for raw materials, spare parts, tools and equipment necessary for efficient caring out of production process. • I collaborated with other departments to make repairs and revisions so that production kept on going. • Supervising activity of well exploitation – natural irruption and gas lift. • Supervising activity of well testing with tri-phase horizontal separators, bi-phase horizontal separators. • Supervising activity of well intervention with coil tubing (involv

  • 3 Jahre und 3 Monate, Aug. 2002 - Okt. 2005

    Production Technician.

    PETROMAR - Romanian Drilling and Production Company – offshore.

    • Activity carried out on the main platform – supervision of crude oil separation activity and maintenance of tri-phase horizontal separators, bi-phase horizontal separators and bi-phase vertical separators. • Prepared to intervene in case of automatic control system failures and other hazardous situations • Supervising the proper function of Dresser – Rand Compressors, ALCO MEG & TEG Regeneration

Ausbildung von Iulian Badescu

  • 4 Jahre und 9 Monate, Okt. 1997 - Juni 2002

    Well Drilling and Oil Field

    Oil and Gas University

Sprachen

  • Englisch

    -

21 Mio. XING Mitglieder, von A bis Z