Joerg Muenzing

Vorstandsmitglied, CEO, LEANMAP

Zug, Schweiz

Über mich

I help company executives and investors turn failing operations around to meet expectations, and bring good operations to a world-class level so they can not only serve their customers better and faster, but also at significantly lower cost. Over the past 20 years, I have led more than 150 transformation programs on six continents, empowering leaders in Pharmaceutical, Automotive, and Technology achieve an unbeatable competitive advantage through Operational Excellence. These programs delivered over $500 million bottom line, at 12x return, so that 96% clients came back for more. With core competencies in industrialization, rationalization, and turnaround management, I craft tailored strategies focused on Lean Transformation, Cost Reduction, Agile Product Development, and Quality Excellence for clients facing daunting challenges or pursuing ambitious goals. If you are looking to accelerate growth, drive productivity, and leverage capital, contact me at www.leanmap.com/call

Fähigkeiten und Kenntnisse

Executive Management
Agile
Interim CEO
Interim COO
General Manager
Interim Management
Management Consulting
Business Process Reengineering
Lean
Lean Manufacturing
Lean Six Sigma Coach
Six Sigma Black Belt
McKinsey Strategy Implementation
Operational Excellence
Cost Reduction
Cost Reductions
Management Coaching
Post Merger Integration
PMI
Production Manager
MRP Consultant
Supply Chain Manager
Business Problem Solver
Greenfield and Brownfield Projects
Interims Manager
Kostenreduktion
Logistik Manager
Produktion Fertigung
Materialwirtschaft
Distributionsmanager
Coaching für Führungskräfte
Prozessanalyse
Beschaffungslogistik und Distribution
Produktionsplanung
Strategische Supply Chain Beratung
Supply Chain Management
Absatzplanung
Bestandsoptimierung
Forecastsysteme
Internationalität
US-Konzernerfahrung
Restructuring
Joerg Michael Muenzing.
Software Development
Board of Directors
Private Equity
Problemlöser
Internationale Führungs- und Konzernerfahrung
Durchsetzungsvermögen
Teamfähig
Mexico Mexiko Erfahrung

Werdegang

Berufserfahrung von Joerg Muenzing

  • Bis heute 19 Jahre und 6 Monate, seit Jan. 2005

    CEO

    LEANMAP

    Operations Consultancy, turning underperforming operations into high performing assets, while creating a competitive advantage from superior quality, speed, efficiency. With core competencies in industrialization, rationalization, and turnaround management, the company helps executives and investors in solving operational constraints, streamlining processes, and driving mission-critical projects to success.

  • 6 Jahre und 2 Monate, Nov. 2017 - Dez. 2023

    Quality Transformation Leader

    Autoliv

    Managed global Quality Excellence initiatives, enhancing satisfaction and cutting losses. Led Agile Engineering, doubling successful product launches. Implemented Quality Excellence, reducing Tunisian plant defects by eight-fold. Spearheaded Operations Diagnostics, boosting efficiency and quality, while pioneering Digital Transformation, Factory of Future, and Lean Production System concepts. Conducted global benchmarking to strengthen safety technology leadership.

  • 1 Jahr und 1 Monat, Juli 2022 - Juli 2023

    Strategic Advisor

    NEOM

    Spearheaded a Supplier Development program in the Industrial Design and Construction (ID&C) sector, systematically assessing and certifying offsite manufacturers and onsite contractors for the construction of a futuristic mega city NEOM. While leading its development and execution, introduced a pioneering Global Certification Standard, published as a handbook, aimed at revolutionizing the construction industry.

  • 2 Monate, März 2023 - Apr. 2023

    Efficiency Strategist

    Boehringer Ingelheim

    Developed a Factory Efficiency program to debottleneck the main antidiabetic drug plant for the U.S. market in Mexico. Targeted improvements reduce downtime by 33%, doubling throughput to €2.5 billion without capital investment through massively increased equipment effectiveness (OEE). Program is currently underway. “The seed of improvement is now in our minds” – Operations Director.

  • 1 Jahr, Jan. 2022 - Dez. 2022

    Operations Turnaround Strategist

    LEO Pharma

    Guided a Factory Turnaround program with a focus on boosting operational efficiency (OEE) by addressing flow constraints, process deviations, and compliance issues, under the scrutiny of the French labor unions. In just 12 months, efficiency doubled, achieving a 32% throughput increase without capital investment. Stock-outs and backlog were eliminated, process deviations decreased by 25%, and lead times reduced from 140 days to under 80 days.

  • 8 Monate, Nov. 2020 - Juni 2021

    Quality Excellence Architect

    FormFactor

    Initiated a Quality Excellence program to reduce non-quality costs (NQC) and improve customer satisfaction through systematic root-cause elimination for equipment dead-on arrival (DOA) and defects-per-unit (DPU). Responsible for developing the program, establishing a zero-defect mindset, coaching cross-functional teams in USA and Germany to improve product maturity and process capability that bring defect rates and costs down to target levels.

  • 6 Monate, Jan. 2020 - Juni 2020

    Strategic Advisor and Speaker

    Boehringer Ingelheim

    Guided the Strategy Development initiative to chart a five-year vision for Operations. This involved designing the future-state and target operating model (TOM), assigning executive authority, responsibility, and accountability (ARA), and developing a strategy deployment roadmap to achieve breakthrough objectives. Furthermore, served as speaker at the group’s performance conference: “How to Systematically Boost Performance Without Capital Investments, Endless Meetings, and Complex Processes.”

  • 1 Jahr und 7 Monate, Juni 2018 - Dez. 2019

    World-Class Manufacturing Leader

    Trioworld

    Led Lean Transformation program for factories in Sweden, Denmark, and France, driving them toward world-class manufacturing (WCM). Oversaw diagnostics, program development, performance reviews, shop floor engagement, and skill development. Introduced 'World-Class Manufacturing Summit' leadership training and Operational Excellence program, yielding annual scrap reductions of 8%, unproductive time reductions of 28%, and productivity increase of 9%.

  • 10 Monate, Dez. 2018 - Sep. 2019

    Cost Reduction Strategist

    GlobalFoundries

    Revitalized and expedited an underperforming Cost Reduction program, strategically focusing on cost-per-move (CPM) by implementing adaptive maintenance, systematic problem analysis, and rigorous root-cause elimination. The collective effort resulted in the execution of over 300 projects, delivering $118 million in cost savings, run rate.

  • 6 Jahre und 3 Monate, Okt. 2012 - Dez. 2018

    Global Head of Lean and Operational Excellence

    Givaudan

    Spearheaded a Lean Transformation program to reduce operating costs in manufacturing and the supply chain, closing a profitability gap. Led teams across 20 production sites in various countries, resulting in 400 improvement projects that added CHF 36 million to the bottom line within 36 months. Trained managers and engineers in Operation Excellence and spearheaded additional initiatives to enhance first-pass quality, benchmark factory performance, and drive improvement through Lean Six Sigma Black Belts.

  • 9 Monate, Jan. 2018 - Sep. 2018

    Agile Engineering Strategist

    Sandvik

    Developed an R&D acceleration program based on Agile principles to shorten time to market by 35% within 18 months, while streamlining the engineering-operations interface. After just 32 support days, R&D project delivery performance increased by 2.5x within the first seven months.

  • 2 Jahre und 4 Monate, März 2016 - Juni 2018

    Lean Transformation Leader

    Norican | Disa & Wheelabrator

    Developed the group's value creation program to increase speed and efficiency of focus factories and engineering centers. The pilot site in Denmark matured at 75% of world-class rate, improved schedule adherence from 33% to 82%, cut rework and overtime cut in half, while increasing productivity by 20%. In parallel, coaching the senior team in strategy deployment (Hoshin Kanri) to deliver on breakthrough objectives.

  • 7 Jahre und 7 Monate, Juli 2010 - Jan. 2018

    Lean Transformation Leader

    Norsk Gjenvinning

    Developed the industrialization program for Norway's leading recycling company. Within 18 months, transformed a poorly performing site from noncompliant to internal benchmark, resulting in 82% lower inventory and 31% higher labor productivity. Ongoing engagement to design new factories (Greenfield) and to drive performance improvements in the six largest plants, while building the skills and systems to sustain them.

  • 2 Jahre und 1 Monat, Dez. 2009 - Dez. 2011

    Global Head of Lean and Quality

    Franke

    Responsible for quality and factory rationalization to steadily raise productivity by +6% per year, while building the skills and capabilities to sustain them. A major plant in the UK, for example, improved productivity by 18%, reduced inventory by 37%, and shortened manufacturing lead-time from 10 to 3 days. After 18 months, critical processes were standardized, 300 managers certified in 28 Boot Camps, and nearly CHF 5 million improvements implemented.

  • 1 Jahr, März 2009 - Feb. 2010

    VP Quality EMEA, Task Force Leader

    Landis Gyr

    Led Quality Excellence to boost product reliability, reduce failures, and cut warranty costs. Formed 9 Quality Taskforce (QTF) teams, addressing hardware and software issues through FMEA and 8D frameworks. Established 'Quality Academy' for quality education. Led 60+ improvement programs across Europe, slashing warranty exposure by CHF 26 million and reducing field failures by 95% to 800pm. EMEA quality system served as APAC model, addressing defects and costs in other regions.

  • 8 Monate, Apr. 2008 - Nov. 2008

    Quality Turnaround Leader

    Daimler, Detroit Diesel

    Directed the Quality Excellence program pivotal in a turnaround effort, spearheading the Warranty Accrual Reduction (WAR) initiative. Managed the project team, achieving a $59 million reduction in warranty accruals within seven months. Enhanced diagnostics and repair efficiency through system improvements and process redesigns, preventing repeat failures. Recognized throughout the Group as a model for successful turnarounds.

  • 3 Monate, Feb. 2008 - Apr. 2008

    Lean Transformation Manager

    Mercedes Benz

    Led Factory Improvement program to recover delayed military vehicle production. Managed project and cross-functional teams, enhancing operations at assembly plant and integrating suppliers. Achieved 25% increase in assembly speed, 60% improvement in yield, and on-time delivery of all 82 vehicles in 10 weeks, resolving significant delay. Recognized by CEO Truck Division for impactful, tangible improvements.

  • 1 Jahr, März 2007 - Feb. 2008

    Operations Turnaround Manager

    Navico (Lowrance, Simrad, B&G)

    Hired in crisis for Manufacturing Turnaround, doubled throughput in Mexico, resolved bottlenecks in Norway and New Zealand. Achieved 44% labor reduction, 53% space savings, 94% inventory cut, 66% rework decrease, and $8M profit boost in 12 months. Over 7 years, productivity soared 1,100% with 31% CAGR, leading to acquisition. Engaged in strategic planning and complexity reduction from 2009 to 2020. CEO recommends for any manufacturing or supply chain role.

  • 1 Jahr und 4 Monate, Dez. 2005 - März 2007

    Factory Integration Manager

    Techtronic Industries

    Led a Factory Consolidation program merging two large assembly plants in Guangdong. Oversaw program development and onsite deployment, involving factory mapping, inventory analysis, budgeting, staffing, stakeholder alignment, and cross-functional leadership. Streamlined material flow and workload, right-sizing staff from 8,000 to 6,000. Achieved a 50% reduction in shortages and late deliveries, decreased on-hand inventories from 46 to 18 days, and added $20 million in manufacturing capacity to meet demand.

  • 1 Jahr und 1 Monat, Feb. 2006 - Feb. 2007

    Lean Transformation Leader

    Gategourmet

    Led performance improvement program to meet profitability targets, overseeing Lean Transformation across seven sites in Europe and Asia. Implemented cellular manufacturing, flow management, and daily scrum, achieving substantial productivity gains despite challenges including engagement with German unions. Resulted in annual savings exceeding CHF 5 million and closure of a significant European warehouse.

Ausbildung von Joerg Muenzing

  • 1 Jahr und 7 Monate, Okt. 2000 - Apr. 2002

    Business Administration

    NSU Nova Southeastern University, Ft Lauderdale, USA

    Graduated with honors, GPA 3.92.

  • 4 Jahre und 10 Monate, Okt. 1989 - Juli 1994

    Electrical Engineering

    FHD Fachhochschule Darmstadt, Germany

    Graduated among top 10%.

Sprachen

  • Deutsch

    Muttersprache

  • Englisch

    Fließend

  • Französisch

    Grundlagen

Interessen

Science
Photography
Diving
Dancing
Fitness
Art

21 Mio. XING Mitglieder, von A bis Z