Ing. Juan Flechas

Bis 2018, Site Construction Coordinator, wpd Construction Canada

Mississauga, Kanada

Fähigkeiten und Kenntnisse

Wind Energy
Solar Energy
Biodiesel
Renewable Energy
Project Engineering
Project Management
Engineering Technologist
Construction

Werdegang

Berufserfahrung von Juan Flechas

  • Bis heute 5 Jahre und 6 Monate, seit Jan. 2019

    Project Coordinator

    Algonquin Power & Utilities Corp.

  • 5 Monate, Juni 2018 - Okt. 2018

    Site Construction Coordinator

    wpd Construction Canada

    + Responsible for the coordination and assistance of construction weekly reports and site progress + Responsible for the activities involving enforcement of the project's Renewable Energy Approval (REA) in regards to Species at Risk, Erosion and Sediment Control Measures, and Tree Cutting for the HV Transmission Line Connection + Responsible for logistics, monitoring and reporting of all construction activities in regards to deliveries, progress and daily inspections

  • 3 Jahre und 1 Monat, Apr. 2015 - Apr. 2018

    Project Manager

    Panasonic Eco Solutions Canada Inc.

    + Assisted in coordinating suppliers, engineers, clients and contractors in order to build solar ground mounted and rooftop photovoltaic systems in Ontario. + Administered logistics, communications documents, reports, engineering drawings and main electrical components in order to build solar pv projects with developers/clients, engineers, suppliers and subcontractors + In overall, 4MW of Solar Energy experience to put it in plain numbers

  • 1 Jahr und 8 Monate, Mai 2014 - Dez. 2015

    Project Engineer and Solar PV Technical Consultant

    Self empoyed

    + Designed, assisted and worked with internal engineering and construction managers to develop general and detailed solar system layouts for solar projects ensuring best practices. + Develop Technical and Financial simulations using PVSyst and RetScreen for Solar PV Systems.

  • 9 Monate, Mai 2014 - Jan. 2015

    Project Engineer

    H.B White Canada

    + Assisted PM and executed request for proposals from various subcontractors and suppliers. + Coordinated with PM and executed Purchase Orders for materials and components needed to build projects. + Administered FTP site for transferring and maintaining documents, pictures, inspections and progress reports, and drawings for the BOP contract between client, subcontractors and prime contractor.

  • 1 Jahr, Juni 2013 - Mai 2014

    Engineering Technologist

    Sunayr Inc.

    + Design, assist and work with internal engineering and construction managers to develop general and detailed solar system layouts for solar projects ensuring best practices + Procure and work closely with solar racking and electrical suppliers to develop solar projects ensuring code compliance and owner’s requirements + Produce analysis and performance reports using PVSyst, Draker and Power Track Monitoring Interface, and RetScreen 4

  • 1 Jahr und 1 Monat, Mai 2012 - Mai 2013

    Engineering Technologist

    GEMCO Solar

    + Design, assist and work with internal engineering and construction managers to develop general and detailed solar system layouts for solar projects ensuring best practices + Procure and work closely with solar racking and electrical suppliers to develop solar projects ensuring code compliance and owner’s requirements. + Developed and wrote company’s Occupational Health and Safety Programs and Procedures for installation, commissioning and maintenance

  • 11 Monate, Okt. 2008 - Aug. 2009

    Chemistry Lab Assistant

    Lambton College

    • Responsible for performing, clarifying and suggesting different ways of performing labs for the students making sure its difficulty, safety performance and environmental harm of its components and equipment. • Analyzed, investigated, made suggestions and improved some of the components that integrate the Lambton’s biodiesel pilot project. • Responsible for performing and developing a lab scale process in order to use grease to obtain biodiesel.

  • 11 Monate, Jan. 2006 - Nov. 2006

    Environmental Technician Assistant

    Environmental Planning

    • Assisted in information management, as well as maintaining the projects files up to date. • Assisted creating legal documentation in the agreement of the landfill gas approaching from Doña Juana’s Sanitary Landfill applying Kyoto Protocol’s Mechanism. • Provided technical assistance and research in the Rehabilitation of Downtown Areas and Land Management Support in Cuenca – Ecuador. Inter-American Development Bank project funded. • Coordinated meetings with various governmental and non-governmental actor

  • 1 Jahr, Jan. 2005 - Dez. 2005

    Environmental Technician Assistant

    Alcaldía Mayor de Bogotá, D. C. - Unidad Administrativa Especial de Servicios Pú

    • Provided technical documents and research of landfill gas capturing, extraction, and alternative uses. • Analyzed statistic data from a landfill gas extraction project and compared it with out-puts of the mathematical model developed by Environmental Protection Agency of United States. • Determined the financial feasibility of the project using Kyoto Protocol’s Mechanism and established a bottom-line of carbon credit trade for the current market in Colombia.

Ausbildung von Juan Flechas

  • 2 Jahre und 11 Monate, Sep. 2009 - Juli 2012

    Sustainable Energy & Building Technology

    Humber College

    Wind & Solar Energy, Energy Conservancy, Energy Metrics, Energy Assessments and Computer Simulations, Building Technology

  • 1 Jahr, Sep. 2008 - Aug. 2009

    Technology

    Lambton College

    Chemistry, Biodiesel

  • 5 Jahre und 5 Monate, Juli 1998 - Nov. 2003

    Environmental Engineering

    Universidad Libre de Colombia

    Waste Management, Basin Management, Environmental Assessments, Landfill Gas Use, Environmental and Financial Assessments

Sprachen

  • Spanisch

    Muttersprache

  • Englisch

    Fließend

Interessen

Music
Books
IronMan / Triathlon

21 Mio. XING Mitglieder, von A bis Z