Dr. Peter Valent

Angestellt, I&C V&V manager on site, AREVA

Deutschland

Fähigkeiten und Kenntnisse

Management of international team
Change Management
Engineering
Requirements Engineering
Engineering Design
Verification and validation
Process Validation
Test Management
Test Method Validation
Software Testing
Hardware Design
Measurement technology
Test and Measurement

Werdegang

Berufserfahrung von Peter Valent

  • Bis heute 7 Jahre und 3 Monate, seit Apr. 2017

    I&C V&V manager on site

    AREVA

    - performing of verification and validation (V&V) for engineering activities/results - co-ordination of I&C changes and validation of correct design implementation - re-testing assessment, change impact analysis, phase review - performing of test coverage analysis - interfacing with construction/commissioning/system preparation division and customer concerning V&V activities - co-ordination of own team - task distributing between on site team & office teams (Erlangen/Paris/Bratislava)

  • 5 Jahre und 3 Monate, Dez. 2012 - Feb. 2018

    V&V Section Head

    Areva

    Line management position: Olkiluoto/Finnland, Erlangen/Germany, Bratislava/Slovakia - Managing section of 10-15 people, developed the competences of the team, - Arranging the task for the team as well as intersection and interdepartmental co-operation - Successfully completed SW testing for the Protection System and Reactor Limitation System in Olkiluoto, Flamanville and Mochovce nuclear power plant - Managed the developing of qualified SW for nuclear testing in Python and PyQt

  • 1 Jahr und 3 Monate, Jan. 2016 - März 2017

    Process system completion and Handover leader

    AREVA

    My responsibilities includes: - Proper handover of I&C systems from construction to commissioning group - Defining system completeness, system boundaries and interfaces - Preparation of ECC (Erection completion certificate) - Leading of system review (Engineering, Procurement & commissioning readiness) - Managing of system related open points - Development of process & method supporting the completion of the transfer task

  • 3 Jahre und 9 Monate, Apr. 2012 - Dez. 2015

    Designer of Hardware Tester for neutron flux measurement

    AREVA

    Project: nuclear power plant Olkiluoto 3, Erlangen/Germany - Developed the graphical user interface, designed test specifications, issued documents - Performed measurement error analysis, hardware analysis and tests in test bay - Successfully completed design and tests with customer approval - Applied Software: Python, PyQt, LabVIEW, LaTeX

  • 1 Jahr und 7 Monate, Sep. 2010 - März 2012

    Group leader for SW simulation testing

    AREVA

    Project: nuclear power plant Mochovce, Bratislava/Slovakia - Developed test principles and test design specifications, executed the tests - Issued documents, reported results - Managed a team of six people, successfully completed project

  • 1 Jahr und 8 Monate, Jan. 2009 - Aug. 2010

    Test Engineer

    AREVA

    Project: nuclear power plant Flamanville 3, Paris/France and Bratislava/Slovakia - Verified and validated SW implementation of I&C functions for Protection Systems and Reactor Control Systems (I&C-Instrumentation and Control)

Ausbildung von Peter Valent

  • 11 Jahre, Jan. 1998 - Dez. 2008

    Microelectronics

    Slovak University of Technology in Bratislava

    Measurement and evaluation of semiconductors properties and parameters

Sprachen

  • Englisch

    Fließend

  • Deutsch

    Grundlagen

  • Tschechisch

    Fließend

  • Slovak

    -

21 Mio. XING Mitglieder, von A bis Z