RAMESH BABU THOTA
Angestellt, Senior Piping Stress Engineer, Dodsal Engineering & Construction Pte. Ltd.
Dubai, Vereinigte Arabische Emirate
Über mich
I have over 19 years of experience in Piping, Pipe line Stress Analysis & Pipe Supports engineering, working with various projects in Oil & Gas, Petrochemicals, FPSO, and Power Plant Piping. My experience as Piping Stress Engineer Performing Piping Stress Analysis for line connected to Reciprocating Compressors, Turbines, Heaters, Re-Boilers, Jacketed Piping, Columns, Pumps, Storage Tanks, Shell & Tubes Exchangers, Air Fin Exchangers, Air coolers, Separators, Drums, Filters, Flare Stack, KO drums, PSV lines, and Pipe rack lines. Performing Piping stress analysis for critical lines in Offshore (FPSO projects), taking into consideration of Structural and hull Deflection in Onsite and Towing conditions, Fatigue Analysis, Flange leakage and Blast analysis Performing Stress Analysis for RTRP (Reinforced Thermosetting Resin Pipe) / FRP (Fiber-reinforced plastic) / GRE (Glass reinforced epoxy) as per ISO14692
Werdegang
Berufserfahrung von RAMESH BABU THOTA
Bis heute 10 Jahre und 2 Monate, seit Mai 2014
Senior Piping Stress Engineer
Dodsal Engineering & Construction Pte. Ltd.
Projects: 1. Execution of a Separation & Compression Center (CSC) at The Periphery South HGA HASSI-MESSAOUD, Algeria, Client: Sonatrach 2. EW Treatment and Injection Plant (NK) (EWTIP), Kuwait, Client : KOC 3. New Gathering Centre, GC-31 in North Kuwait, Client: KOC. (As-Built) 4. Hail & Ghasha Development Project, Abu Dhabi, Client: ADNOC. (Pre-Bid) 5. ESTIDAMA - Sales Gas Pipe line Network Enhancement Project, HGCP - Phase 1 & 2 & PKG 3 & 6 Client: ADNOC. (Pre-Bid)
2 Jahre und 8 Monate, Okt. 2011 - Mai 2014
Deputy Manager - Piping Stress (Team Lead)
Valdel Engineering & Constructors
Projects: 1. Normal Alpha - Olefins Expansion Project (NAO), Baytown, Texas. Client: Chevron Phillips Chemical Company Ltd. 2. Eunice Extraction Plant, Eunice, LA. Client: CROSS TEX Energy Services 3. Hexane Project, Cedar Bayou Chemical Complex, Baytown, Texas. Client: Chevron Phillips Chemical Company Ltd. 4. ECHO-1 Project, Lake Charles Chemical Complex, Westlake, Louisiana. Client: SASOL North America Inc.
1 Jahr und 4 Monate, Juni 2010 - Sep. 2011
Sr. Engineer - Piping Stress
Foster Wheeler India Ltd.
Projects: 1. Paradip Refinery Project, Paradip, Orissa State, India. Client : Indian Oil Corporation Limited
9 Monate, Sep. 2009 - Mai 2010
Sr.Piping Engineer - Piping Stress
L & T Chiyoda Ltd.
Project: 1. Phase III Refinery Project, Mangalore Hydrogen Generation Unit (MHGU), and Client: Mangalore Refinery & Petro chemicals Ltd.
2 Jahre und 5 Monate, Jan. 2007 - Mai 2009
Piping Engineer- Stress
Tecnimont S.p.A
Project: 1. NKNK Project (NIZHNEKAMSK NEFTEKHIM), Client : NKNK (JSC NIZHNEKAMSK NEFTEKHIM), TATARSTAN, RUSSIA 2. Bocamina – II 350 MW POWER PLANT, Client : Maire Engineering, Chile - South America 3. TANNECO, Client : OJSC Tenneco Refining & Petrochemical Complex, Nizhnekamsk
1 Jahr und 1 Monat, Jan. 2006 - Jan. 2007
Design Engineer – Piping Stress
M/s TECHNIP INDIA LTD.
Performing Piping stress analysis for critical lines in Offshore (FPSO projects), taking into consideration of Structural and hull Deflection in Onsite and Towing conditions, Fatigue Analysis, Flange leakage and Blast analysis Project: 1. AKPO Field Development Project (FPSO), Client : TOTAL Upstream Nigeria Limited
1 Jahr und 1 Monat, Dez. 2004 - Dez. 2005
Design Engineer – Piping Stress
M/s Sudelettra Nigeria Limited.
Project: 1. EBOCHA Oil Centre, Plant Revamping (Phase2), Client : Nigerian Agip Oil Company Ltd. (NAOC) 2. QIT FIRE WATER SYSTEM UP GRADE. Client : Exxon Mobil Producing Nigeria Unlimited
2 Jahre und 3 Monate, Sep. 2002 - Nov. 2004
Graduate Apprentice Trainee
Bharat Heavy Electricals Limited
Project & Role: 1. Preparation of Piping GAD, Isometrics, BOM, Piping Supports and Flexibility Analysis of 1 x 25 MW STG., for M/s Rama News prints & Paper Ltd. using CEASAR - II 4.30 and AutoCAD 2. Preparation of Piping GAD, Isometrics, BOM and Supports of 2x20.1 MW STG., for M/s Supreme Renewable Energy Limited using PDMS and AutoCAD 3. Preparation of Piping GAD, Isometrics, BOM and Supports of 2x20.1 MW STG., for M/s Vasavadatta Cements LTD. using PDMS and AutoCAD
Ausbildung von RAMESH BABU THOTA
4 Jahre und 1 Monat, März 1998 - März 2002
Mechanical Engineering
Jawaharlal Nehru Technological University, Hyderabad
Sprachen
Englisch
Fließend