Timo Marwig

ist offen für Projekte. 🔎

Angestellt, Logistikleiter, Marelli E-Powertrain

Köln, Deutschland

Fähigkeiten und Kenntnisse

Supply Chain Management
Industrialisierung / Manufacturing Engineering
Lean Manufacturing / Operational Excellence
Leadership

Werdegang

Berufserfahrung von Timo Marwig

  • Bis heute 2 Jahre und 3 Monate, seit Apr. 2022

    Logistikleiter

    Marelli E-Powertrain

  • Bis heute 2 Jahre und 3 Monate, seit Apr. 2022

    Logistik Manager

    Marelli Electric Powertrain Cologne (Germany) GmbH

    Verantwortlich für die gesamte Supply Chain und Werkslogistik

  • Bis heute 5 Jahre und 6 Monate, seit Jan. 2019

    Manager Layout Planning & Supply Chain Management

    GETRAG FORD Transmissions GmbH

    Supported by my team of experts in the fields of lean & layout planning, transport management, packaging design and supplier management, I take on the responsibility for all logistics and layout planning activities. My objective is to continuously optimize the logistics activities in our production sites and our supply chain in terms of costs, quality and delivery performance. We are lean experts using tools such as Value Stream Design to implement most modern production practises.

  • 2 Jahre und 3 Monate, Okt. 2016 - Dez. 2018

    Teamleader Supplier Management - Lean Supply Chain

    GETRAG FORD Transmissions GmbH, Magna Powertrain

    I lead a multicultural team to continuously monitor, evaluate and develop our worldwide supply base of 300 production part suppliers. We delivered online and on-site support at suppliers to solve delivery contraints using a newly developed lean tool box. To improve the logistics quality and delivery performance of our suppliers I released a logistics guideline and designed a MMOG based audit tool which we successfully used for example to onboard our new Indian supply base (+10 suppliers).

  • 2 Jahre und 4 Monate, Juli 2014 - Okt. 2016

    Project Lead - Lean, Layout, Plant Engineering

    GETRAG FORD Transmissions GmbH

    As a senior engineer in the biggest new product project in the company's history I was responsible to coordinate layout, industrial and plant engineering activities. The focus was to create lean production Systems in terms of material flow, layout, automation strategy, ergonomics. We successfully set up a new production site in Sanand, India, we restructured a 600k unit production facility in France and we guided our implemention teams in Brazil and China.

  • 4 Jahre und 6 Monate, Jan. 2010 - Juni 2014

    Lean Manufacturing Coordinator

    GETRAG Corporate Group

    As the central lean coordinator for GFT I coordinated and tracked the local lean activities of my plant counterparts. I lead numerous kaizen events from VSM to 5S and SMED in all plants. I wrote and released the GPS - GETRAG Production System - as a standard guideline for all GFT and GETRAG plants. I was the lead auditor to measure the plants performance against the GPS for 3 following years.

  • 2 Jahre und 10 Monate, Apr. 2007 - Jan. 2010

    Industrial Engineer, Material Flow Planning

    GETRAG Ford Transmissions GmbH

    Using lean practices such as standardized work, TWI and Yamazumi I optimized manual processes in assembly lines during the launch of the first double clutch transmission production in Kechnec, Slovakia. I improved the FIFO systems and installed zero failure devices.

  • 1 Jahr und 3 Monate, Okt. 2005 - Dez. 2006

    Process Improvement Coordinator

    GKN Driveline Newton LLC - former GETRAG Corp.

    I managed the company's scorecard/dashboard. I standardized the reporting for coordinated improvement activities across the entire organization. In my master thesis I defined a lean production system and conducted a gap analysis to prioritize future kaizen activities.

  • 7 Monate, Jan. 2005 - Juli 2005

    Internal Logistics Specialist

    Hella Lighting Corp. SC, USA

    On a daily basis I worked on calculating and optimizing the kanban and fifo structures in the production areas. I created a plan for every part and standardized packaging concepts.

  • 5 Monate, Juni 2004 - Okt. 2004

    Praktikant Qualität Entwicklung

    DaimlerChryslerAG

Ausbildung von Timo Marwig

  • 1 Jahr, Jan. 2005 - Dez. 2005

    Business Administration

    Pfeiffer University

  • 5 Jahre und 6 Monate, Okt. 2001 - März 2007

    Wirtschaftsingenieurwesen

    FH Recklinghausen

    Automobilwirtschaft und -technik

Sprachen

  • Englisch

    Fließend

  • Spanisch

    Grundlagen

  • Deutsch

    Muttersprache

Interessen

Reisen
Sport - insb. Fussball u. Tennis

21 Mio. XING Mitglieder, von A bis Z