Vesa Lepistö
Angestellt, Head of Energy Management, Carnival Maritime GmbH
Abschluss: Master of Science (M.Sc.), Aalto University School of Science and Technology
Hamburg, Deutschland
Werdegang
Berufserfahrung von Vesa Lepistö
1 Jahr und 4 Monate, März 2021 - Juni 2022
Team Lead Energy& Environment
Meyer Turku Oy
Leading an innovative team of seven specialist under concept development department.
4 Jahre und 3 Monate, Jan. 2017 - März 2021
Senior Energy Efficiency Specialist, Lead of Dynamic simulations
Meyer Turku
2 Jahre und 1 Monat, Dez. 2014 - Dez. 2016
Energy Efficiency Analyst
Vesa Lepistö Technical Office
Work includes energy efficiency studies as well as dynamic simulation analyses.
5 Jahre und 8 Monate, Feb. 2009 - Sep. 2014
System Coordinator
Meyer Turku
11/2013 I worked as a system coordinator in machinery department for main engines and auxiliaries cooling systems. Also bilge-, ballast- and heeling systems were under my responsibility. In addition, I participated to Energy Efficiency projects. 02/2009 Promotion to an System Coordinator and start of the master studies next to work in September 2009. Different projects like SRtP (Safe Return to Port) and energy efficiency studies.
1 Jahr, Mai 2013 - Apr. 2014
Master's Thesis
Meyer Turku (former STX Finland)
"Dynamic simulation studies on ship energy management” The aim was to simulate and study two systems. These two systems were the chilled water system and the waste heat recovery to heat accumulator tanks. Modelling and simulations was done with the Apros-dynamic process simulation software. The study proved that a proper simulation model can give valuable insights into the design of energy efficient ship including operability issues.
Energy projects on Process and Plant Engineering- unit.
11 Monate, Apr. 2008 - Feb. 2009
Designers Training Course
STX Finland
Theory lessons were held in DeltaMarin Raisio and work based learning was done in STX Europe shipyard in machinery department.
10 Monate, Jan. 2008 - Okt. 2008
Bachelor's Thesis
Sachtleben Pigments
“Use of compressed air in the end part of pigment plant” The purpose of this thesis was to determine how much and where compressed air was consumed and then reduce the air consumption.
6 Monate, Apr. 2007 - Sep. 2007
Machine fitter trainee
Fortum
Preventing and repairing malfunctions of boiler- and turbine units in coal-fired power plant.
Ausbildung von Vesa Lepistö
1 Jahr, Jan. 2012 - Dez. 2012
Energy Efficiency Expert 30cr
Aalto University Professional Development
Apprenticeship-type program of continuing professional education. Development Project: Increasing the use of frequency converters and analyse the potential to use absorption chiller on cruise vessel.
5 Jahre und 2 Monate, Sep. 2009 - Okt. 2014
Energy Technology
Aalto University School of Science and Technology
Major: Energy Technology Minor: HVAC
4 Jahre und 2 Monate, Sep. 2004 - Okt. 2008
Mechanical Engineering and Production Technology
Turku University of Applied Sciences
Major: Energy and Environmental Technology
2 Jahre und 9 Monate, Sep. 2000 - Mai 2003
Matriculation Examination
Meri-Pori Upper Secondary
Mathematics: A-level
Sprachen
Englisch
Fließend
Deutsch
Grundlagen
Finnisch
Muttersprache
Schwedisch
Grundlagen